MSTSingapore

Chip design and layout RFQ

Alcance

For teams that need help before or after MPW scoping: analog/mixed-signal blocks, RF or sensor front-ends, small RTL-to-GDS tasks, layout cleanup, DRC/LVS readiness, PDK/NDA handoff planning, and tapeout-readiness review. Intake is outline-first: share project goals, block type, node target, schedule and engagement scope only. Confidential schematics, source code, netlists, GDS, and PDK-bound material are handled only after the proper NDA path.

Podemos ayudar con

01

Design-scope screen

Classify what can be quoted as design support, layout support, review, or partner introduction.

02

Tapeout-readiness path

Identify likely gaps before MPW: PDK/NDA, DRC/LVS, package/test, schedule and ownership.

03

NDA-first engagement

Confidential design detail is exchanged only after the proper NDA and engagement scope.

Datos requeridos

01

Requested support

02

Target node / process range

03

Target timeline

04

Project outline

Entregables

01

Scope classification

02

Readiness-gap list

03

Next-step engagement path

No aceptado

01

Confidential schematics, RTL, netlists, GDS/OASIS, PDK files or proprietary source code at intake

Control de revisión

This is an outline-first RFQ. Do not submit confidential design IP at intake. Export-controlled or restricted technical content is held for manual review.

FAQ

?

What is Chip design and layout RFQ?

Outline-first RFQ for analog, mixed-signal, RF, sensor, layout, DRC/LVS and tapeout-readiness support before mature-node MPW.

?

What information should be submitted at intake?

Requested support, Target node / process range, Target timeline, Project outline

?

Can confidential design files be uploaded through public intake?

Public intake is non-confidential. Do not submit GDS, netlists, RTL, schematics, PDK files or proprietary design IP before the correct NDA and partner confirmation path.

?

Does MST review compliance or risk before routing this RFQ?

This is an outline-first RFQ. Do not submit confidential design IP at intake. Export-controlled or restricted technical content is held for manual review.