Singapore

SMALL-VOLUME SILICON · HUMAN-REVIEWED

Need a few chips, not a full production run?

Email a non-confidential brief. MST screens mature-node MPW fit, shuttle timing and the package/test path.

90 / 55 / 40nmNo sign-inHuman-confirmed slot
Shared silicon wafer and an engineer handling a small chip sample

FIT BEFORE SCHEDULE

Three questions decide the route

Three integrated-circuit die layouts illustrating power analog, mixed-signal memory and logic design profiles
01

What does the chip do?

Power / analog, embedded memory or logic changes the process route.

02

How ready is the design?

A concept, schematic, layout or clean GDSII each needs a different next step.

03

What must come back?

Bare die, package, electrical test and sample handling are separate decisions.

Engineers coordinating around a wafer map, bare dies, package and test fixtures

HUMAN COORDINATION

From one email to an actionable path

  1. 1Email a non-confidential brief
  2. 2MST screens process fit
  3. 3People confirm slot and terms
  4. 4Align package and test

Public schedules are screening references. Slot, price, PDK/NDA, data acceptance and tapeout eligibility are confirmed case by case.

Send the project to MST
Need the 2026 reference windows?The detailed schedule stays out of the way until you need it.Open schedule

Calendario HHGrace MPW 2026

HHGrace 2026 MPW Shuttle Schedule

Reference schedule transcribed from the provided HHGrace shuttle table for first RFQ screening. Final slot, PDK/NDA path, pricing, package/test scope and acceptance are confirmed by MST after review.

FabNodoPlataformaDescripciónBooking DeadlineETO and Data inJanFebMarAprMayJunJulyAugSepOctNovDec
Fab790nm90nm Low Power BCD1.5V/5V/5-40V(BCD), 1.5V/5V/5-40V BCD + eFlash20th/Month25th/MonthHM427AHM428AHM429A
Fab790nm90nm Embedded Nord-FlashAggressive 90nm LP, ULL 1.5V/5V(Nord-Flash)20th/Month25th/MonthHM430AHM431AHM432A
Fab755nmBC55NHSU255nm_BiCMOS(SiGe)_High Speed_1.2V/2.5V5th/Month10th/MonthHM442A
Fab955nmBD55NLPUE55nm_BCD_Low Power_1.2V/5V Vgs, 5V/9V/12V/24V Vds20th/Month25th/MonthJM123AJM124A
Fab955nm55nm Logic /55nm Nord-Flash55nm 1.2V/2.5V(Logic), 55nm 1.2V/5V or 1.2V/2.5V/5V(Nord-Flash)20th/Month25th/MonthJM125AJM126AJM127AJM128A
Fab940nm40nm Logic /40nm Nord-Flash40nm 1.1V/2.5V(Logic), 40nm 1.1V/5V or 1.1V/2.5V/5V(Nord-Flash)5th/Month10th/MonthJM129AJM130AJM131A
Email MST about a shuttle window

Public page shows shuttle codes and month windows only. Supplier cost, contacts, emails, contracts and internal commercial details are not published.

AFTER THE FIT CHECK

Enter only the workstream you need

NEED MORE DEPTH?

Technical depth, when you need it