Services
Choose the right non-confidential RFQ path. MPW shuttle intake, packaging/test, chip design, SECS/GEM, logistics and sourcing are routed separately so MST can review the requirement correctly.
Route the requirement to the right MST asset path
Use this page as a lightweight solution finder. SKU, sourcing, MPW, design, engineering and technical-guide paths are separated so MST can recommend the next step without over-claiming price, inventory, slot or partner acceptance.
Power, magnetic and prototype SKUs
Product-type categories first, with Direct SKU or RFQ SKU shown as item-level purchase states.
Sourcing RFQBOM, substitute and hard-to-find parts
For requests that are not direct-buy catalog goods and need supplier matching, evidence and commercial review.
MPW serviceHHGrace mature-node MPW
For node/process fit, die-size range, package/test assumptions, schedule target and NDA/PDK path.
Design partnerChip design, layout and engineering support
For early design, layout, DRC/LVS, packaging/test or engineering partner screening before confidential file exchange.
Engineering integrationSECS/GEM, MES and equipment integration
For factory equipment connectivity, data collection, prototype test, reliability and implementation support.
Technical GuidesApplication and selection guides
High-intent technical content that turns engineering questions into SKU, service, sourcing or RFQ next steps.
HHGrace mature-node MPW shuttle RFQ intake is open
Start here for 90nm, 55nm or 40nm mature-node platform screening. Share process node, die size, schedule target, package/test assumptions and sample needs. Final quotation and availability are confirmed after review.
Mature-node MPW coordination RFQ
mpw-tapeout-rfqJoin a mature-node and specialty-process MPW demand pool before sharing design IP. MST collects high-level RFQs from overseas fabless teams, universities, research labs and industrial chip groups, then screens node fit, process family, die-area range, PDK/NDA path, package/test needs, schedule window, country profile and end use. No GDS, OASIS, netlists, RTL, source code, PDK files or proprietary IP are accepted at intake.
RFQ-based service quotationPackaging, dicing and test RFQ
packaging-test-rfqScope the post-wafer work that turns prototype silicon into usable samples: wafer dicing, bare-die handling, QFN/BGA/WLCSP or ceramic package assumptions, open-cavity needs, socket/load-board expectations, wafer probe, packaged test, sample quantity, shipment, and acceptance criteria. MST does not guarantee package availability, yield, schedule, or final pricing before partner review; we organize a qualified, case-by-case RFQ path after the high-level brief.
Chip design and layout RFQ
chip-design-layout-rfqFor teams that need help before or after MPW scoping: analog/mixed-signal blocks, RF or sensor front-ends, small RTL-to-GDS tasks, layout cleanup, DRC/LVS readiness, PDK/NDA handoff planning, and tapeout-readiness review. Intake is outline-first: share project goals, block type, node target, schedule and engagement scope only. Confidential schematics, source code, netlists, GDS, and PDK-bound material are handled only after the proper NDA path.
SECS/GEM equipment integration RFQ
secs-gem-integrationFor equipment builders, lab-tool teams and integrators who need to bridge legacy RS-232, ASCII, Modbus, TCP or PLC-style equipment toward SECS/GEM (HSMS) host communication. The public open-source resources are early/v0 and suitable for learning, prototyping, simulator work and integration evaluation; production deployment requires equipment-specific mapping, validation and customer acceptance testing.
Prototype logistics and re-spin RFQ
prototype-logistics-respinCoordinate the operational work after a prototype wafer or sample lot exists: sample shipment, export documents, wafer/sample handling assumptions, re-spin planning, small engineering lots, and transition from first silicon to the next MPW or pilot quantity. MST screens customer, country, end use, shipment path and partner acceptance before any quote path is opened.
Custom sourcing and RFQ coordination
sourcing-rfqSourcing / RFQ intake for requests that are not direct-buy Store goods and not the MPW service. MST turns BOM lists, drawing parts, substitute-model requests, supplier-match needs, Singapore quotation requests and cross-border order constraints into a buyer-safe sourcing packet for operator review. Public intake accepts non-confidential summaries only; detailed drawings, controlled files and supplier-sensitive material should be shared only after MST confirms the correct review path.
RFQ-based sourcing quotation