MPW capacity, package/test, PDK/NDA and design readiness are often discussed in separate conversations.
Mature-node MPW prototype path
Mature-node MPW prototype teams should not start by sending design files publicly. MST first screens node, process family, die-size range, package/test needs, PDK/NDA status, sample objective and schedule, then routes MPW, packaging/test, design or RFQ next steps with final partner acceptance and quote human-confirmed.
Teams need first-pass feasibility before exposing confidential GDS, netlists, RTL or PDK material.
Academic, startup and industrial prototype teams often need schedule and sample-path screening before formal quote.
What MST routes
What MST routes
Start from the scenario, then enter the correct SKU, MPW, sourcing, design, guide or RFQ path.
Open mature-node MPW screening, node cards and readiness checks.
MPW readinessCheck the first non-confidential fields before RFQ submission.
Pricing factorsUnderstand quote drivers without treating the page as a published price table.
PDK/NDA pathSeparate public screening from NDA-gated design-file exchange.
MPW RFQSubmit the non-confidential MPW coordination RFQ for MST review.
What to prepare
- Target node and process family, or acceptable alternatives.
- Estimated die-size range and design-readiness stage.
- Package/test assumption and sample objective.
- PDK/NDA status, target schedule, customer country and non-confidential end use.
Human-confirmed boundaries
- Public MPW pages are screening surfaces, not foundry bookings or slot reservations.
- Do not send GDS, OASIS, netlists, RTL, PDK files or controlled technical data through public forms.
- Partner acceptance, PDK/NDA access, schedule, quotation and compliance review are confirmed case by case.
Turn this into a non-confidential MST brief
Use the scenario prompt to generate a first routing brief. Price, stock, slot, PDK/NDA path, sample availability and replacement fit are confirmed by MST after review.