MSTSingapore
MPW prototype

Mature-node MPW prototype path

Mature-node MPW prototype teams should not start by sending design files publicly. MST first screens node, process family, die-size range, package/test needs, PDK/NDA status, sample objective and schedule, then routes MPW, packaging/test, design or RFQ next steps with final partner acceptance and quote human-confirmed.

AI assistedMST confirmed

MPW capacity, package/test, PDK/NDA and design readiness are often discussed in separate conversations.

Teams need first-pass feasibility before exposing confidential GDS, netlists, RTL or PDK material.

Academic, startup and industrial prototype teams often need schedule and sample-path screening before formal quote.

What MST routes

What MST routes

Start from the scenario, then enter the correct SKU, MPW, sourcing, design, guide or RFQ path.

Ask MST AI

What to prepare

  • Target node and process family, or acceptable alternatives.
  • Estimated die-size range and design-readiness stage.
  • Package/test assumption and sample objective.
  • PDK/NDA status, target schedule, customer country and non-confidential end use.

Human-confirmed boundaries

  • Public MPW pages are screening surfaces, not foundry bookings or slot reservations.
  • Do not send GDS, OASIS, netlists, RTL, PDK files or controlled technical data through public forms.
  • Partner acceptance, PDK/NDA access, schedule, quotation and compliance review are confirmed case by case.

Turn this into a non-confidential MST brief

Use the scenario prompt to generate a first routing brief. Price, stock, slot, PDK/NDA path, sample availability and replacement fit are confirmed by MST after review.